Parking Map


Click here for live Forum construction video


September 23, 2020

  • Removal of meeting room space in the Forum took place and construction continues. (See Photo)

September 14, 2020

  • Prepearation for the demolition of meeting room space in the Forum has begun. (See Photo)

August 17, 2020

July 10, 2020

  • Construction continues on existing projects. (See Photo)

May 13, 2020

  • The Forum temporary bridge installation is complete. (See Photo)
  • Construction of Westin Atlanta Gwinnett Hotel continues. (See Photo)

April 27, 2020

  • The Forum bridge has been taken down and the temporary bridge installed. (See Photo)
  • New pole lights have been installed around campus.
  • The C Lot has been prepped for paving.
  • Progress on the hotel continues. (See Photo)

April 3, 2020

  • Forum Hall C and gallery walls are up and painted.
  • New egress doors installed exiting from Hall A to the hallway.
  • A3 project is continuing to progress.

February 25, 2020

  • Forum Expansion Project Phase 1 has begun.
  • Driveway in front of the Forum remains blocked for all through traffic.
  • A Lots partially closed. Lots A1 and A5 will open for Arena events.
  • Campus Map

January 27, 2020

December 3, 2019

  • Driveway in front of the Forum is blocked for all through traffic.
  • Limited access for events behind the buildings.
  • Campus Map

September 19, 2019

  • Ribbon cutting ceremony held for opening of Infinite Energy Center Deck #1.
  • See Photo

September 17, 2019

  • Infinite Energy Center Deck #1 will officially open September 19, 2019.
  • New traffic signal at 6400 Sugarloaf Pkwy is now active.
  • New traffic signal at the Satellite Blvd entrance is now active.
  • Parking Deck #2 will remain under construction with an estimated open date in December.

September 4, 2019

  • New traffic signals at 6400 Sugarloaf Pkwy will activate starting Thursday, September 5th.
  • Parking Deck #1 is scheduled to open September 19th.
  • Progress Photos

July 11, 2019

  • Sugarloaf entrance (by Quikrete building) will be shutdown down blocking access down the hill toward Infinite Energy Center starting Monday, July 15, 2019 and will not reopen until Friday, July 26th. PLEASE NOTE: The entrance to the Hotel, the Quikrete Building and Tin Lizzy’s will remain open.
  • GA DOT will complete the Sugarloaf turn lane and add a traffic signal, as well as add a traffic signal on Satellite Blvd with the opening of Deck 1.
  • Progress Photos

April 22, 2019

  • Campus Entrance: Fans, attendees, and guests should use the main campus entrance off of Sugarloaf Parkway – See Map
  • Deliveries/Event Set-Up: Deliveries, service needs, and event set-up should use Meadow Church Road/Paul McCartney Blvd to enter the service area – See Map

JANUARY 11, 2019

  • Satellite Blvd entrance will be closed Monday, January 14th.  All traffic should enter from Sugarloaf Parkway entrance
  • Continue to expect intermittent lane changes and delays on the entrance driveway from Satellite Blvd entrance
  • Parking Deck #1 construction continues (Progress Photo)

OCTOBER 18, 2018

  • 10/22/18 – 11/2/18: Road Closure on Campus (Map and Directions)
    • The second right turn into the Theater/Hudgens parking lot (C parking lots) from Satellite Blvd. will be closed.
    • This area will be closed Monday – Friday of both weeks.
    • Access to the C parking lots and back-of-house will still be accessible from the first turn coming in from Satellite Blvd.
    • Access road towards the Forum and Arena will remain open during this time.
  • 10/31/2108: Road Closure on Campus (Map and Directions)
    • Access road towards the Forum and Arena will be CLOSED.
    • No through traffic to Tin Lizzy’s or Holiday Inn from Satellite Blvd. entrance.
    • All through traffic will need to enter campus at Arena Drive and Sugarloaf Parkway intersection.
    • Satellite Blvd. entrance will only be accessible for back-of-house, Theater, and Hudgens traffic.
    • November 1st is a backup rain delay option.

OCTOBER 1, 2018

  • Expect intermittent lane changes and delays on the driveway from Satellite Blvd entrance until mid to late November
  • Parking Lot B3 is now closed.
  • Temporary parking will be available in Lot B4
  • Additional parking available in Lot A1

SEPTEMBER 26, 2018

  • Expect intermittent lane changes and delays on the driveway from Satellite Blvd entrance until mid to late November
  • Parking Lot B3 will close on October 1st to begin construction on a second parking deck
  • Temporary parking will be available in Lot B4.
  • Additional parking available in Lot A1

AUGUST 17, 2018

  • Driveway in front of the Forum is now open.
  • Temporary parking lots will remain open for general parking needs – Lots B4, D1, and D2 (see parking map for reference).
  • Forum ADA parking will still be available under the pedestrian bridge (“horseshoe” driveway).

JUNE 29, 2018

  • Road Detour is currently underway.
    • Egress from B4 and ADA parking under the pedestrian bridge (“horseshoe” driveway), must exit through B4 lot and turn left towards Sugarloaf Parkway in order to exit the property.
    • Driveway in front of the Forum will be temporarily closed for 5-6 weeks.
      Traffic from Satellite Blvd entrance will detour through the Forum parking lot.

      • Parking Option 1: Guests can park in B3 and exit right out of the lot towards Sugarloaf Pkwy
      • Parking Option 2: Guests can park in B4 lot and exit back through B4 lot to exit left towards Sugarloaf Pkwy
      • Parking Option 3: Guests will park in A1 and exit right out of the lot towards Sugarloaf Pkwy.
  • Reminders:
    • Main parking directly across from the Forum is closed for construction.
    • Temporary Lots are open for use – Lots B4, D1 and D2 (see parking map for reference).
    • Forum ADA parking is available under the pedestrian bridge (“horseshoe” driveway).
STAY INFORMED.